EPCO Project – Effluent Treatment Plant for ANCAP – Eastern Terminal (PTE-TE)

Contract LUMP SUM, Project, Construction and Operation of an Effluent Treatment Plant for ANCAP in José Ignacio (Eastern Terminal), Maldonado. It consists of a Civil, Industrial, Hydraulic, Electromechanical and Automated Control System Project. Operation and Maintenance of the same for 2 years.

Project EPC – 1st Ethanol Plant for ALUR in Bella Unión

Project LUMP SUM in consortium with Dedini Industries of Base (Brazil). Project, supply, assembly and start-up of a distillery to produce hydrated ethyl alcohol from sugar cane juice and molasses at the Alfredo Mones Quintela Agro-industrial Plant, Department of Artigas. Structural Civil Works, construction of metallic structures, hydraulic networks, Electromechanical and Industrial assembly, Process Engineering and Equipment supplied by Dedini Industrias de Base (Brazil). Project and installation of the Fire-fighting System, Electrical Installation, Construction and Assembly of Pump Room, Control Room and Automation.

Project EPCO – ANCAP EFFLUENT TREATMENT PLANT FOR THE TEAK REFINERY (PTE-LT).

Contract LUMP SUM, for the Project and Construction of an Effluent Treatment Plant for ANCAP at the La Teja refinery. It consists of Design of the Process of Treatment of Refinery Effluents, prior to its discharge in the bay, Comprehensive Project of PTE-LT, Construction and Assembly Electromechanical and Automated Control System (SCADA).